{"id":86258,"date":"2023-01-24T16:19:01","date_gmt":"2023-01-24T12:19:01","guid":{"rendered":"https:\/\/dev.armhanq.com\/texut\/"},"modified":"2026-04-12T22:10:29","modified_gmt":"2026-04-12T18:10:29","slug":"texut","status":"publish","type":"page","link":"https:\/\/dev.armhanq.com\/en\/about-us\/miutyan-andamner\/texut\/","title":{"rendered":"\u201cTeghut CJSC\u201d"},"content":{"rendered":"\n<div class=\"wp-block-atbs-tabs atbs-tabs-0eaa1d73\"><div class=\"tabs-container\"><div class=\"tabs-nav\"><ul class=\"tabs-titles\"><li class=\"tab-title icon_left\" data-title-tab-id=\"1\" role=\"button\"><span class=\"tab-title-text\"><strong>About the Company<\/strong><\/span><\/li><li class=\"tab-title icon_left\" data-title-tab-id=\"2\" role=\"button\"><span class=\"tab-title-text\">Head<\/span><\/li><\/ul><\/div><div class=\"tabs-content\">\n<div class=\"wp-block-atbs-tab\"><div class=\"single-tab\" data-tab-id=\"1\" data-tab-parent-id=\"atbs-tabs-0eaa1d73\">\n<p><strong>Teghut CJSC<\/strong> was established to operate the <strong>Teghut deposit<\/strong> in the Lori region, which ranks <strong>second in Armenia<\/strong> in terms of copper and molybdenum reserves.<\/p>\n<p>The mine\u2019s <strong>copper-molybdenum ore reserves<\/strong> are estimated at <strong>450 million tons<\/strong>, with confirmed <strong>molybdenum reserves of approximately 100,000 tons<\/strong> and <strong>copper reserves of 1.6 million tons<\/strong>.<\/p>\n<p><strong>2006\u20132013: Design and Construction of Teghut Mining and Processing Plant<\/strong><\/p>\n<p>Between 2006 and 2013, <strong>Teghut CJSC<\/strong> carried out extensive <strong>design and construction works<\/strong> for the Teghut mining and processing plant.<\/p>\n<p>For the construction, more than <strong>700 hectares of land<\/strong> were allocated, including <strong>357 hectares of forested area<\/strong>. During this period, over <strong>140 facilities<\/strong> were built, with the main ones including:<\/p>\n<ul>\n<li><strong>Primary crushing plant<\/strong><\/li>\n<li><strong>Flotation processing plant<\/strong><\/li>\n<li><strong>Tailings management system<\/strong>, including tailings storage facility, tailings pipelines, water diversion structures, industrial water systems, and pumping stations<\/li>\n<li><strong>Open-pit mine<\/strong><\/li>\n<li><strong>Mining transport equipment facility<\/strong><\/li>\n<li><strong>Infrastructure facilities<\/strong>, including administrative buildings, water and wastewater treatment plants, pumping stations, and others<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p><strong>2014 \u2013 Commissioning of Teghut Mining and Processing Plant<\/strong><\/p>\n<p>In its very first year of operation, the <strong>Teghut mine<\/strong> became the <strong>second-largest copper mine in Armenia<\/strong>, significantly contributing to the <strong>economic development of northern regions<\/strong> and addressing <strong>local employment needs<\/strong>.<\/p>\n<p><strong>2018 \u2013 Suspension of Plant Operations<\/strong><\/p>\n<p>According to studies conducted by international specialized organizations, the suspension of operations was due to <strong>preliminary data indicating potential stability risks of the tailings dam<\/strong>. These initial findings were later confirmed by independent consultants. Based on this information, <strong>Teghut CJSC made the difficult decision to temporarily suspend ore extraction<\/strong>.<\/p>\n<p>\u00a0<\/p>\n<p><strong>2019 \u2013 Resumption of Production and Restart of the Mining and Processing Plant<\/strong><\/p>\n<p>In <strong>April\u2013May 2019<\/strong>, <strong>Teghut CJSC<\/strong> carried out extensive <strong>repair, restoration, and commissioning works<\/strong>, including the <strong>decommissioning of hazardous industrial facilities<\/strong>. The company obtained the <strong>license to restart the mining and processing plant<\/strong> and resumed production with an annual capacity of <strong>7 million tons of ore<\/strong>.<\/p>\n<p>By the end of 2021, Teghut CJSC expects to <strong>extract and process approximately 47 million tons of ore<\/strong> during the production cycle.<\/p>\n<p>To <strong>reduce risks related to tailings dam stability<\/strong>, the company has developed and is implementing a set of <strong>stability enhancement measures<\/strong>, including:<\/p>\n<ul>\n<li>Developing and enforcing <strong>strict daily monitoring standards<\/strong> for the condition of the tailings dam<\/li>\n<li><strong>Artificially lowering the water level<\/strong> in tailings through depressurization<\/li>\n<li>Conducting <strong>additional studies of the dam\u2019s physical and mechanical properties<\/strong><\/li>\n<li>Designing projects for <strong>strengthening the tailings dam<\/strong><\/li>\n<li>Implementing <strong>reinforcement works using rockfill<\/strong>, among other measures<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p>The operation of <strong>Teghut CJSC\u2019s mining and processing plant<\/strong> has created approximately <strong>1,100 jobs<\/strong> and made a significant contribution to addressing <strong>employment challenges in the region<\/strong>. Fully compliant with all standards established by <strong>Armenian law<\/strong>, Teghut CJSC is listed among the country\u2019s <strong>major taxpayers<\/strong>.<\/p>\n<p>Between 2019 and 2021, the company <strong>planned to pay over AMD 28.2 billion<\/strong> to the state budget.<\/p>\n<p><strong>Email:<\/strong> info@teghoutmining.am<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-atbs-tab\"><div class=\"single-tab\" data-tab-id=\"2\" data-tab-parent-id=\"atbs-tabs-0eaa1d73\">\n<div class=\"wp-block-media-text is-stacked-on-mobile is-vertically-aligned-center\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"667\" height=\"1000\" src=\"https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/02\/\u0412.\u0418.\u041d\u0430\u043b\u0438\u0432\u0430\u0439\u043a\u043e-1.jpeg\" alt=\"\" class=\"wp-image-2213 size-full\" srcset=\"https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/02\/\u0412.\u0418.\u041d\u0430\u043b\u0438\u0432\u0430\u0439\u043a\u043e-1.jpeg 667w, https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/02\/\u0412.\u0418.\u041d\u0430\u043b\u0438\u0432\u0430\u0439\u043a\u043e-1-200x300.jpeg 200w\" sizes=\"auto, (max-width: 667px) 100vw, 667px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p>General Director: <\/p>\n\n\n\n<p>Viktor Nalivaiko<\/p>\n\n\n\n<p><\/p>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>About the CompanyHead Teghut CJSC was established to operate the Teghut deposit in the Lori region, which ranks second in Armenia in terms of copper and molybdenum reserves. The mine\u2019s copper-molybdenum ore reserves are estimated at 450 million tons, with confirmed molybdenum reserves of approximately 100,000 tons and copper reserves of 1.6 million tons. 2006\u20132013: &#8230;<\/p>\n","protected":false},"author":1,"featured_media":1628,"parent":86280,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"class_list":["post-86258","page","type-page","status-publish","has-post-thumbnail","hentry"],"uagb_featured_image_src":{"full":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"thumbnail":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-150x150.png",150,150,true],"medium":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-300x239.png",300,239,true],"medium_large":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-768x611.png",620,493,true],"large":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-1024x815.png",620,493,true],"gs-tiny":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",50,40,false],"xl":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"xxl":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"xxxl":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"xxxxl":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"xxxxxl":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"1536x1536":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"2048x2048":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png",1500,1194,false],"tie-small":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-70x70.png",70,70,true],"tie-large":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-300x160.png",300,160,true],"slider":["https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1-620x330.png",620,330,true]},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/dev.armhanq.com\/en\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"About the CompanyHead Teghut CJSC was established to operate the Teghut deposit in the Lori region, which ranks second in Armenia in terms of copper and molybdenum reserves. The mine\u2019s copper-molybdenum ore reserves are estimated at 450 million tons, with confirmed molybdenum reserves of approximately 100,000 tons and copper reserves of 1.6 million tons. 2006\u20132013:&hellip;","coauthors":[],"author_meta":{"author_link":"https:\/\/dev.armhanq.com\/en\/author\/admin\/","display_name":"admin"},"relative_dates":{"created":"Posted 3 years ago","modified":"Updated 4 weeks ago"},"absolute_dates":{"created":"Posted on 24\/01\/2023","modified":"Updated on 12\/04\/2026"},"absolute_dates_time":{"created":"Posted on 24\/01\/2023 16:19","modified":"Updated on 12\/04\/2026 22:10"},"featured_img_caption":"","featured_img":"https:\/\/dev.armhanq.com\/wp-content\/uploads\/2023\/01\/logo-1.png","series_order":"","_links":{"self":[{"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/pages\/86258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/comments?post=86258"}],"version-history":[{"count":1,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/pages\/86258\/revisions"}],"predecessor-version":[{"id":86833,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/pages\/86258\/revisions\/86833"}],"up":[{"embeddable":true,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/pages\/86280"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/media\/1628"}],"wp:attachment":[{"href":"https:\/\/dev.armhanq.com\/en\/wp-json\/wp\/v2\/media?parent=86258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}